[rbridge] Proposed new milestones
Joe Touch
touch at ISI.EDU
Wed Sep 5 19:56:31 PDT 2007
Regarding the PAS, I'd be very glad to wrap it up by Dec. Unfortunately,
I have received no input on the pending issues indicated therein since
Oct 2006. Do we have a plan on how to resolve those open issues?
(I can post a summary to the list if that'd help)
Joe
Erik Nordmark wrote:
> Any comments on these proposed new milestone dates? We discussed
> withdrawing the second milestone at and before Chicago. Do the dates
> look reasonable?
>
>
> Dec 2007 Submit architecture document to IEEE/IETF expert review
>
> WITHDRAWN Submit routing protocol requirements to the IESG for
> publication as an Informational RFC
>
> Dec 2007 Submit problem statement and applicability to IESG for
> Informational RFC
>
> Mar 2007 Submit architecture document to the IESG for publication
> as an Informational RFC
>
> Done Choose routing protocol(s) that can meet the
> requirements
>
> Dec 2007 Submit base protocol specification to IEEE/IETF
> expert review
>
> Mar 2008 Base protocol specification submitted to the
> IESG for publication as a Proposed Standard RFC
>
> Dec 2008 Re-charter or shut down the WG
>
> ------
>
> For reference - the currently posted list of milestones are:
> Done Accept base protocol specification as a WG document
>
> Done Accept problem statement and applicability as a WG work
> item
>
> Done Start work with routing area WG(s) to undertake TRILL
> extensions
>
> Done Accept architecture document as a WG work item
>
> Done Accept routing protocol requirements as a WG work item
>
> Aug 2006 Submit architecture document to IEEE/IETF expert review
>
> Aug 2006 Submit routing protocol requirements to the IESG for
> publication as an Informational RFC
>
> Aug 2006 Submit problem statement and applicability to IESG for
> Informational RFC
>
> Nov 2006 Submit architecture document to the IESG for publication
> as an Informational RFC
>
> Dec 2006 Choose routing protocol(s) that can meet the
> requirements
>
> Dec 2006 Submit base protocol specification to IEEE/IETF
> expert review
>
> Mar 2007 Base protocol specification submitted to the
> IESG for publication as a Proposed Standard RFC
>
> Jul 2007 Re-charter or shut down the WG
> _______________________________________________
> rbridge mailing list
> rbridge at postel.org
> http://mailman.postel.org/mailman/listinfo/rbridge
--
----------------------------------------------------------------------
Joe Touch Sr. Network Engineer, USAF TSAT Space Segment
Postel Center Director & Research Assoc. Prof., USC/ISI
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 250 bytes
Desc: OpenPGP digital signature
Url : http://mailman.postel.org/pipermail/rbridge/attachments/20070905/6201427b/signature.bin
More information about the rbridge
mailing list